Standard One offers the following alternative options for purchasing apartments
Mortgage
Installments
Mortgage calculator
Installment calculator
Calculate your installment plan
Floor
Apartment
Floor space
Cost
Floor
Apartment
Floor space
Cost
123
add new apartment
Costs if you pay 100% 0 $

-15% of first installment

Prepayment
Some error
The minimum amount of prepayment for this type of apartment is 7000 $
Grace period
maximum installment period up to 01.02.2020
Promotion code
No active promocode
To get you discount, enter your promotion code
add promotion code
Monthly instalment 0 $
Apartment costs 0 $
RECEIVE YOUR ESTIMATION
Success
ORDER CONSULTATION
Some error
Success
03.04.2026
CONSTRUCTION PROGRESS OF S1 OBOLON. MARCH 2026

CONSTRUCTION PROGRESS OF S1 OBOLON. MARCH 2026

We’re sharing the latest updates from the S1 Obolon construction site for March 2026, along with our plans for April 2026.

What was completed in March:

1. Brickwork: Internal wall brickwork on the 11th, 12th, 13th, and 16th floors has been completed 100%.

2. Work on balcony installation continues on different sides of the building. On the main and side faсades, installation of brackets, metal structures, and fiber cement panels is 80% complete, while on the rear faсade it has reached 40%.

3. Installation of the heating system has begun:

- Heating manifolds – 30% complete
- Water supply manifolds – 30% complete
- Radiator installation – 30% complete

4. The SPOK faсade on the 1st and 2nd floors has reached 100% completion.

Plans for April:

1. In April, we plan to fully complete brickwork up to the 16th floor.

2. Continue balcony installation on all sides of the building. On the main, side, and rear faсades, installation of brackets, metal structures, and fiber cement panels will be brought to 100%.

3. Advance the heating system installation up to the 16th floor:

- Heating manifolds – 80%
- Water supply manifolds – 80%
- Radiators – 50%

4. Complete SPOK faсade transitions on the 1st and 2nd floors.

5. Finalize internal plastering and screed works from the 11th to the 15th floors.

S1 Obolon Team

03.04.2026
CONSTRUCTION PROGRESS OF S1 POZNIAKY. MARCH 2026
23.03.2026
3% DISCOUNT WITH 100% PAYMENT FOR APARTMENTS IN S1 POZNYAKY
20.03.2026
“DOUBLE COMBO” AT S1 OBOLON: SAVE UP TO $31,500 + $5,000 OFF PARKING
all news
:
Visit our showroom.
We accurately recreate one of our future apartments.
You have the opportunity to rate the quality of renovation and furniture by our own.

“You can schedule for a preview and we will make a delicious coffee”

Incorrect name
illicit phone
incorrect mail
Please choose a different date

We’re waiting for you at