Standard One offers the following alternative options for purchasing apartments
Mortgage
Installments
Mortgage calculator
Installment calculator
Calculate your installment plan
Floor
Apartment
Floor space
Cost
Floor
Apartment
Floor space
Cost
123
add new apartment
Costs if you pay 100%0$
-15% of first installment
Prepayment
Some error
The minimum amount of prepayment for this type of apartment is 7000 $
Grace period
maximum installment period up to 01.02.2020
Promotion code
No active promocode
To get you discount, enter your promotion code
add promotion code
Monthly instalment0$
Apartment costs0$
Overpayment0$
-15% of first installment
RECEIVE YOUR ESTIMATION
Some error
Success
ORDER CONSULTATION
Some error
Success
Visit our showroom
We accurately recreate one of our future apartments. You have the opportunity to rate the quality of renovation and furniture on your own.
S1 Terminal
Central Railway Station, Kyiv
INVEST IN APARTMENTS WITH FINISHED INTERIORS
Build-to-rent apartment complex
At S1 Terminal, we have combined everything for comfortable living, business, and leisure with a single goal:
TO ENSURE THE HIGHEST PROFITABILITY FROM REAL ESTATE INVESTMENTS.
BUSINESS-CLASS APARTMENTS WITH FINISHED INTERIORS
Choose from fully furnished apartments ready for move-in, or a “white box” finish
INFRASTRUCTURE STIMULATES RENTAL DEMAND
lounge area, 2 restaurants, coworking space, fitness club
PROFITABLE LOCATION FOR BUSINESS TOURISM
in the country's main transport hub
GET PASSIVE INCOME FROM RENTING APARTMENTS
you choose whether to personally handle the operational processes of renting out, or entrust it to us
In a minute walk access
Terminal
Location
Shops
Cafe
Parking
Subway
ATM
Railway station
Show on a map
Shops
Cafe
Parking
Subway
ATM
Railway station
Modern and ergonomic design
A functional interior will remain relevant for years. Smart zoning and a kitchenette allow to combine short and long term rental models for maximum occupancy of the hotel.
Installation of fiber cement facade panels on the HVAC side — 75% complete. Insulation, subsystem installation, and fiber cement “PARUS” — 75% complete. Construction of the four-story annex near the HVAC — 20% complete. Waterproofing of the water meter unit and preparatory work for the heating point installation — completed.
MAY 2025
Installation of brackets, insulation, and aluminum facade profiles (80%); Aluprof MB‑86 ST windows and doors (100%); utility meter room (100%); installation of the “PARUS” metal structure (100%); annex near the fire-exit (25%).
APRIL 2025
In April, 60% of the brackets, insulation, and aluminum profiles for the ventilated facade system were installed (floors 7–24, excluding the 22nd floor) at the Terminal project. 40% of aluminum window and door system production and installation has been completed.
MARCH 2025
Sail metal structure assembled. 40% of the ventilated façade system and 20% of aluminum window-door systems completed.
FEBRUARY 2025
Facade works on the courtyard side: installation of brackets and substructure (4th-11th floors), installation of support pipes (11th-24th floors), 40% completion of the sail metal structure
DECEMBER 2024
A significant stage has been completed: Installation of fiber cement panels for the ventilated facade system from +38.914 m to +72.811 m (13th to 24th floors) is 100% done. One side of the building is finished.
NOVEMBER 2024
All external works have been completed on the side of Polzunova Street
OCTOBER 2024
On the Sicheslavska Street side, the ventilated facade was fully completed. On the Novus side, the installation of aluminum profiles of the NVF system was completed, as well as the manufacture and installation of fire cutoffs and outlets from the ACP system of the NVF system on floors 13-24
September 2024
On the Novus side, the following works were performed: installation of aluminum and galvanized brackets of the NVF system from the 13th to the 24th floors; installation of insulation in 2 layers, NVF system from the 13th to the 24th floor in the amount of 50%. On the side of Sicheslavska Street: Installation of aluminum profiles and slopes from fiber cement slabs of the NVF system from 13th to 24th floors - 100%; Cutting and installation of fiber cement slabs of the NVF system from 13th to 24th floors - 50%.
AUGUST 2024
Fully insulated the building and completed the installation of aluminum profiles from the 13th to the 24th floors
June 2024
Completed: the works on the arrangement of the NPF from the Novus store to the 6th floor are 100% completed
JULY 2024
Completed: complete installation of aluminum and galvanized brackets of the HVF system from the mark +38.914m to +72.839m at the level from 13th to 24th floors - 100%; started installation of insulation in 2 layers, HVF system at the level from 13th to 24th floors
May 2024
Completed work up to the 6th floor is 90% complete.
April 2024
In April, we focused on the preparatory work for the installation of the newly constructed building on the Novus store side. The works up to the 6th floor are 90% complete.
March 2024
Completed: installation of hinged ventilated facades up to the 11th floor from Sicheslavska Street.
FEBRUARY 2024
Completed: installation of non-ventilated facades (NVF) on floors 5-11, axis A (Vokzal side) - 100% completed; installation of translucent structures on floors 17-24, axis A (Novus side) and along Sicheslavska Street - also successfully completed by 100%; installation of NVF on the Sicheslavska Street side - 6 floors.
JANUARY 2024
The installation of non-ventilated facades on floors 5-11 of the A-axis (Vokzal side) has reached 80%. The installation of non-ventilated facades on floors 5-11 of the A-axis (Vokzal side) has begun - we are aiming for 100% completion; installation of translucent structures on floors 17-24 of the A-axis (Novus side).
DECEMBER 2023
The floor of the fourth floor of the extension has been completed; all reinforced concrete works of the extension are now complete. Installation of translucent structures on the 12th-17th floors along the A-axis has begun.
November 2023
Overlapping of the third floor of the extension is completed; vertical elements of the fourth floor of the extension are installed; work has begun on translucent structures above the 11th floor.
OCTOBER 2023
We have completed the vertical elements and are finalizing the flooring of the third floor
SEPTEMBER 2023
We completed the monolithic works on the first floor of the extension and started working on the monolithic verticals of the second floor.
AUGUST 2023
We have installed window frames along the A-G axis up to the 11th floor and are finishing glazing the windows
JULY 2023
We installed window frames along the A-G axis up to the 11th floor and started glazing the windows.
JUNE 2023
We have completed the installation of window frames along the axes 1-15 and 15-1 up to the 11th floor and are installing window frames along the axes A-G up to the 11th floor
MAY 2023
We have completed the installation of window structures along the axis 15-1 to the 11th floor. We continue to install window structures along the 1-15 axis
APRIL 2023
Started installation of window systems along the E axis up to the eleventh floor
DECEMBER 2021
Finished 50% of 25th floor monolith and brickwork up to 22th floor
AUGUST 2021
Finished monolith of 16th and 17th floor & brickwork up to 12th floor
OCTOBER 2021
Finished monolith up to 22th floor and brickwork up to 16th floor
NOVEMBER 2021
Finished monolith up to 24th floor and brickwork up to 18th floor
JANUARY 2022
Finished monolith of 25th floor and 20% of 26th floor monolith, as well as 181 sq. m. concrete preparation of yard paving
FEBRUARY 2022
Finished 60% of the roof monolith and 80% of the extension pile field.
OCTOBER 2022
Completed 100% of the monolith, arranged the grillage of the extension, began to modernize the networks B1, K1, K2
NOVEMBER 2022
The foundation of the extension has been completed, the vertical elements of the extension have been completed by 50%, the modernization of networks B1, K1, K2 is completed by 50%
MAY 2021
Finished monolith up to 11th floor and brickwork up to 5th floor
JUNE 2021
Finished monolith of 13th floor & brickwork up to 7th floor
JULY 2021
Finished monolith up to 15th floor & brickwork up to 10th floor
SEPTEMBER 2021
Finished monolith up to 19th floor and brickwork up to 14th floor.
DECEMBER 2020
We're finished monolith of 1st floor and started 2nd floor
APRIL 2021
Finished monolith up to 8th floor & brickwork on 1st floor
FEBRUARY 2021
Finished monolith up to 3rd floor and started 4th floor
OCTOBER 2020
Started building of 1st floor
JUNE 2020
We have completed the building of the pile field. This is a huge preparatory stage of work, without any construction is impossible
LLC «STANDARTPROEKT» 03035, Kyiv city, Georgia Kirpy str, 5 EDRPOU (National State Registry of Ukrainian Enterprises and Organizations): 41309581 Foundation date: 28.04.2017 Director: Dmytro Avdyukhov
Bank details:
IBAN (USD) UA 97 322313 0000026007000051004 IBAN (USD) UA 24 325365 0000000260060007323
General contractor:
LLC “KDD STANDARD” 03035, Kyiv city, Georgia Kirpy str, 5B EDRPOU (National State Registry of Ukrainian Enterprises and Organizations): 42042645 Foundation date: 03.04.2018 Director: Kucher Tetyana Mykolayivna