05.07.2024
S1 TERMINAL CONSTRUCTION PROGRESS. JUNE 2024
Construction News S1 Terminal: what was done in June 2024 and our plans for July
In June, the work on the installation of the overhead wiring from the Novus store to the 6th floor was completed by 100%
In July, we plan to install aluminum and galvanized brackets of the overhead support system from the level of +38.914m to +72.839m (13-24 floors) - 100% complete. As well as the installation of insulation in 2 layers, the NVF system from the mark +38.914m to +72.839m (13-24 floors) - by 50%