CONSTRUCTION PROGRESS OF S1 OBOLON. April 2024
The construction is progressing according to plan and we are very pleased with the way things are going. The weather has been favorable, allowing us to maintain a steady pace of work.
In April, it was done:
- Installation of vertical elements of the second floor is 100% complete.
- Installation of the second floor slab is 100% complete.
- Installation of vertical elements of the third floor is 50% complete.
Plans for May 2024:
- We will complete the installation of vertical elements of the third floor and the installation of the floor slab of the third floor by 100%.
- We will complete 30% of the vertical elements of the fourth floor.
Our results for April show that we are confidently moving towards our goal.
Thank you for your trust and support! Together we are creating the future!