Standard One offers the following alternative options for purchasing apartments
Mortgage
Installments
Mortgage calculator
Installment calculator
Calculate your installment plan
Floor
Apartment
Floor space
Cost
Floor
Apartment
Floor space
Cost
123
add new apartment
Costs if you pay 100% 0 $

-15% of first installment

Prepayment
Some error
The minimum amount of prepayment for this type of apartment is 7000 $
Grace period
maximum installment period up to 01.02.2020
Promotion code
No active promocode
To get you discount, enter your promotion code
add promotion code
Monthly instalment 0 $
Apartment costs 0 $
RECEIVE YOUR ESTIMATION
Success
ORDER CONSULTATION
Some error
Success
05.10.2020
Construction progress of S1 TERMINAL. September 2020

Construction progress of S1 TERMINAL. September 2020

The first month of autumn flew by very quickly, but for us it was very productive, because the following was done on the site:

  • We have 100% completed the horizontal waterproofing of the pit, with an area of ​​1200 sq. M .;

  • 100% completed the concrete preparation of the protective layer of waterproofing, 50 mm high and an area of ​​1200 square meters;

  • Work has begun on the implementation of vertical waterproofing of the pit - completed by 20% (200 sq. M.)

  • 80% completed monolithic work on the -1 floor (210 cubic meters)

  • A drainage system has been completed by 80%, which will protect our foundation from contact with moisture and rapid destruction, increase the stability of the soil, and reduce its frost expansion.

At the moment, minor works are being performed related to buttresses. 26 piles were drilled. Reinforcement has begun, it is necessary in order to give the concrete elasticity, because over time, under the influence of many factors, it can crack and crumble.

S1 Terminal ready on 11%.

Don't miss the latest news from the construction site!

Follow the construction via webcam on our website.

05.04.2024
APRIL: SPECIAL OFFERS FROM S1 TERMINAL
05.04.2024
APRIL: SPECIAL OFFERS FROM S1 OBOLON
01.04.2024
S1 TERMINAL CONSTRUCTION PROGRESS. March 2024
all news
:
Visit our showroom.
We accurately recreate one of our future apartments.
You have the opportunity to rate the quality of renovation and furniture by our own.

“You can schedule for a preview and we will make a delicious coffee”

Incorrect name
illicit phone
incorrect mail
Please choose a different date

We’re waiting for you at