Standard One offers the following alternative options for purchasing apartments
Mortgage
Installments
Mortgage calculator
Installment calculator
Calculate your installment plan
Floor
Apartment
Floor space
Cost
Floor
Apartment
Floor space
Cost
123
add new apartment
Costs if you pay 100% 0 $

-15% of first installment

Prepayment
Some error
The minimum amount of prepayment for this type of apartment is 7000 $
Grace period
maximum installment period up to 01.02.2020
Promotion code
No active promocode
To get you discount, enter your promotion code
add promotion code
Monthly instalment 0 $
Apartment costs 0 $
RECEIVE YOUR ESTIMATION
Success
ORDER CONSULTATION
Some error
Success
13.10.2025
CONSTRUCTION PROGRESS OF S1 TERMINAL. SEPTEMBER 2025

CONSTRUCTION PROGRESS OF S1 TERMINAL. SEPTEMBER 2025

S1 Terminal construction reaches the final stage

In September, construction of S1 Terminal entered its final stage.
The focus is now on completing the building’s key external elements, with the overall readiness nearing 100%.

Completed in September:

- Ventilated facade (4th–25th floors) — 95%

- Canopy metal structure installation (Sicheslavska St.) — 100%

- Four-storey annex near the main entrance — 90%

Plans for October:

- Complete the ventilated facade (100%)

- Finish the annex near the main entrance (100%)

S1 Terminal is on the home stretch: major structural works are being finalized, moving the project closer to completion and commissioning.

10.10.2025
Oleksandr Ovcharenko: “Investors seek a balance between quality, product readiness, and profitability”
09.10.2025
CONSTRUCTION PROGRESS OF S1 OBOLON. SEPTEMBER 2025
23.09.2025
SEPTEMBER: SPECIAL OFFERS FROM S1 OBOLON
all news
:
Visit our showroom.
We accurately recreate one of our future apartments.
You have the opportunity to rate the quality of renovation and furniture by our own.

“You can schedule for a preview and we will make a delicious coffee”

Incorrect name
illicit phone
incorrect mail
Please choose a different date

We’re waiting for you at