11.09.2023
S1 TERMINAL CONSTRUCTION PROGRESS. August 2023
Construction progress of the S1 Terminal project in August 2023:
- installed window frames along the A-G axis up to the 11th floor;
- finishing the glazing of windows.
Plans for September 2023:
- monolithic works of the extension.