14.06.2023
S1 TERMINAL CONSTRUCTION PROGRESS. May 2023
S1 Terminal project construction progress in May 2023:
We have completed the installation of window structures along the axis 15-1 to the 11th floor.
In June 2023, we are installing window structures along the axis 1-15 to the 11th floor.
We have completed the installation of window structures along the axis 15-1 to the 11th floor.
In June 2023, we are installing window structures along the axis 1-15 to the 11th floor.