CONSTRUCTION PROGRESS OF S1 TERMINAL. November 2022
Despite the massive rocket attacks and power outages, our team is diligently continuing work on the construction of the S1 Terminal apart-hotel.
In November 2022, we completed:
- Arrangement of the foundation of the 4-story extension.
- Installation of vertical elements of the 4-story extension by 50%.
- Arrangement of intra-site networks K1, K2, B1 by 50%.
Despite all the obstacles, we remain in touch with our investors and do everything possible to bring the handing over of the S1 Terminal apart-hotel as soon as possible.
In November 2022, we completed:
- Arrangement of the foundation of the 4-story extension.
- Installation of vertical elements of the 4-story extension by 50%.
- Arrangement of intra-site networks K1, K2, B1 by 50%.