Standard One предлагает следующие альтернативные варианты приобретения квартир
Ипотека
Рассрочка
Кредитный калькулятор
Калькулятор рассрочки
Калькулятор розстрочки
Поверх
Квартира
Площа
Вартість
Поверх
Квартира
Площа
Вартість
123
додати квартиру
Вартість при оплаті 100% 0 $
Аванс
Some error
мінімальний аванс для цього типу квартир - 7000 $
Строк відтермінування
максимальный период рассрочки до 1.02.2020
Промокод
No active promocode
для отримання знижки вкажіть промокод
додати промокод
Щомісячний платіж 0 $
Загальна вартість 0 $
Отримати розрахунок
Success
Замовити консультацію
Some error
Success
03.12.2018
Construction progress 3.12

Construction progress 3.12

Section "A"

  •          The reinforced concrete frame of the building is completed.
  •          The brickwork is done from the 3rd to the 14th and from the 16th to the 23rd floors; it is still in process on the 15th, 24th floors.
  •          The stairways are fully mounted.
  •          Ventilation units are installed from 3rd to 24th floor.
  •          Construction and installation work on the design of a glass facade of 1 - 2 floors are being carried out, the frame installation is still in process.
  •          Windows on floors 3 - 14 and 16 - 23 are mounted, work continues.
  •          Work is underway to make a floor screed, work is done on the 4th - 16th and 19th - 21st floors.
  •          Work is underway to arrange a balcony screed on floors 3 - 6.
  •          Work is underway on the device for facade insulation; work has been carried out from the 3rd to the 16th floor.
  •          Work is underway on the installation of a balcony fence frame from floors 3 to 24, is 60% complete.
  •          Work is underway on the installation of utility networks for hot and cold water, is 50% complete.
  •          The distribution of heating pipes is 75% complete.
  •          Drainage is made by 50%.
  •          Works on putting the plaster on walls of 16-24 floors are carried out from 4-14 floors.
  •          Works on waterproofing of balconies are carried out. 3-22 floors have been completed.
  •          Works on the installation of apartment doors are performed on the 4-8th floors.
  •          Finishing work started at 4th floor for 8%, 6th - for 8%, 8th - for 15%.
  •          The installation of the equipment of the boiler house is carried out at 70%, works are also carried out on the gasification of the boiler room at the site of work performed at 60%.

 

Section "B"

  •          Section frame is completed.
  •          The brickwork is made from the 3rd to the 24th floor.
  •          The stairways are fully mounted.
  •          The ventilation units are fully mounted.
  •          Windows are installed from 3rd to 24th floor.
  •          Installation of plumbing networks is underway.
  •          Sewer risers mounted from 3rd to 24th floor.
  •          The first zone of the risers for water supply and heating from the 3rd to the 12th floor is mounted at 100%. We started work on the installation of the second water supply zone from the 13th to the 24th floor.
  •          Work is underway on the installation of utility networks for hot and cold water, is 65% complete.
  •          The distribution of heating pipes is 90% complete.
  •          Drainage is 90% complete.
  •          Work on the device screed floor performed on 4 - 20 floors.
  •          Work is being carried out on the device screed of the balconies, performed on 5 - 18 floors.
  •          Work on the insulation and installation of the ventilated facade from 1 to 22 floors, is 97% complete.
  •          The installation of the balcony fence frame from the 3rd to the 24th floors is being carried out, is 75% complete.
  •          Work on the facade insulation from 3 to 24 floors, is 80% complete.
  •          Works on the waterproofing of balconies are performed on floors 4 - 17.
  •          Works on putting the plaster on walls on 3 and 21 - 23 floors, plaster works are performed on 4 - 20 and 22, 24 floors.
  •          Works on the installation of apartment doors are carried out on floors 5 - 19.
  •          Finishing works of apartments are being carried out: on the 5th floor - 70%, on 6th - 60%, on 7th - 80%, on 8th - 20%, on 9th - 1%, on 10th - 15%, on 11th - 5%, on12th - 20%, on 14th - 8%, on 15th - 5%.
  •          Installation of furniture and household appliances on the 7th floor has begun.


    PHOTOREPORT

12.03.2022
Information for investors and partners
29.12.2021
APARTHOTELS: WORLD STANDARDS OF INVESTMENT IN UKRAINE
16.11.2021
What income you can get by investing in the first apart-hotel in Kyiv.
все новости
:
欢迎参观我们的样版屋
我们精确地打造了一间完工后的房间
您有机会用自己的眼睛评估完工后装修和家具的质量

预约参观我们的公寓,我们将为您提供美味的咖啡

Некорректное имя
Некорректный телефон
Некорректная почта
выберите другу дату, пожалуйста

Ждем вас на чашечку кофе в