Standard One offers the following alternative options for purchasing apartments
Mortgage
Installments
Mortgage calculator
Installment calculator
Calculate your installment plan
Floor
Apartment
Floor space
Cost
Floor
Apartment
Floor space
Cost
123
add new apartment
Costs if you pay 100% 0 $

-15% of first installment

Prepayment
Some error
The minimum amount of prepayment for this type of apartment is 7000 $
Grace period
maximum installment period up to 01.02.2020
Promotion code
No active promocode
To get you discount, enter your promotion code
add promotion code
Monthly instalment 0 $
Apartment costs 0 $
RECEIVE YOUR ESTIMATION
Success
ORDER CONSULTATION
Some error
Success
Visit our showroom
We accurately recreate one of our future apartments.
You have the opportunity to rate the quality of renovation and furniture on your own.

S1 Terminal

Central Railway Station, Kyiv

INVEST IN APARTMENTS WITH FINISHED INTERIORS

Build-to-rent apartment complex

At S1 Terminal, we have combined everything for comfortable living, business, and leisure with a single goal:

TO ENSURE THE HIGHEST PROFITABILITY FROM REAL ESTATE INVESTMENTS.

Concept Concept
<br /> <b>Notice</b>: Undefined property: SOneSlide::$title in <b>/var/www/html/cache/smarty/compile/a0/46/5b/a0465b341808ae0871dd64e6c2d34200311c409a.file.terminal.tpl.php</b> on line <b>322</b><br />
<br /> <b>Notice</b>: Undefined property: SOneSlide::$title in <b>/var/www/html/cache/smarty/compile/a0/46/5b/a0465b341808ae0871dd64e6c2d34200311c409a.file.terminal.tpl.php</b> on line <b>322</b><br />
<br /> <b>Notice</b>: Undefined property: SOneSlide::$title in <b>/var/www/html/cache/smarty/compile/a0/46/5b/a0465b341808ae0871dd64e6c2d34200311c409a.file.terminal.tpl.php</b> on line <b>322</b><br />
<br /> <b>Notice</b>: Undefined property: SOneSlide::$title in <b>/var/www/html/cache/smarty/compile/a0/46/5b/a0465b341808ae0871dd64e6c2d34200311c409a.file.terminal.tpl.php</b> on line <b>322</b><br />
BUSINESS-CLASS APARTMENTS WITH FINISHED INTERIORS

Choose from fully furnished apartments ready for move-in, or a “white box” finish

INFRASTRUCTURE STIMULATES RENTAL DEMAND

lounge area, 2 restaurants, coworking space, fitness club

PROFITABLE LOCATION FOR BUSINESS TOURISM

in the country's main transport hub

GET PASSIVE INCOME FROM RENTING APARTMENTS

you choose whether to personally handle the operational processes of renting out, or entrust it to us

In a minute walk access

Terminal
Location
Shops
Cafe
Parking
Subway
ATM
Railway station
Show on a map
  • Shops
  • Cafe
  • Parking
  • Subway
  • ATM
  • Railway station

Choose your investment model

Investment model"White box" apartmentsHotel apartments
Renovation White box with furniture and appliances
Apartment management Investor Hotel operator
Proportional income distribution using the "pool"* model

*pool - The Pool is a form of apartment owners association in a hotel where the net profit from apartment renting is distributed among them according to a predetermined ratio. The amount of income of each apartment owner combined in a pool depends only on the number of apartments owned by such an owner, and not on how often they were rented out.

Concept

Investment in apart-hotel using the “Pool” model

Ready-to-operate rental business without investor's operational involvement

  • You acquire fully-furnished hotel apartments with appliances and ready for occupancy, requiring no additional expenses.
  • Operational processes and four-star level service for managing the apartments are provided by an international hotel operator.
  • The concept entails earning passive income from the daily rental of apartments without investor participation.

Modern and ergonomic design

A functional interior will remain relevant for years. Smart zoning and a kitchenette allow to combine short and long term rental models for maximum occupancy of the hotel.

room photo room photo room photo
DETAILS

Investment in apartments with “White Box” finishing

Ideal for medium-term rentals

  • You invest in apartments with a “white box” finish and have complete control over them.
  • All that remains is for you to select furniture and appliances to your taste, with which we will gladly assist
  • You can also entrust us with the management of the apartments, to avoid getting involved in the operational processes of renting out.

Concept

*an example of what your apartment could look like

What is “White Box”?

Investors do not spend additional time and resources on finishing, and residents won't be awakened by drilling noises.

Painted walls and ceiling

Finishing of the floor (laminate)

Installation of sockets, switches and lighting

Installed and decorated bathroom

Entrance and interior doors

Air conditioner

Kitchen furniture without appliances

Investment in offices and commercial space

CONSTRUCTION PROGRESS
FEBRUARY 2024
JANUARY 2024
DECEMBER 2023
November 2023
OCTOBER 2023
SEPTEMBER 2023
AUGUST 2023
JULY 2023
JUNE 2023
MAY 2023
APRIL 2023
NOVEMBER 2022
OCTOBER 2022
FEBRUARY 2022
JANUARY 2022
SEPTEMBER 2021
DECEMBER 2021
OCTOBER 2021
NOVEMBER 2021
AUGUST 2021
JULY 2021
JUNE 2021
MAY 2021
APRIL 2021
DECEMBER 2020
FEBRUARY 2021
OCTOBER 2020
JUNE 2020
FEBRUARY 2024

Completed: installation of non-ventilated facades (NVF) on floors 5-11, axis A (Vokzal side) - 100% completed; installation of translucent structures on floors 17-24, axis A (Novus side) and along Sicheslavska Street - also successfully completed by 100%; installation of NVF on the Sicheslavska Street side - 6 floors. Our plans for March 2024: we will focus on the installation of the NVF on the Novus store side to ensure maximum stability and safety of the future building.

JANUARY 2024

The installation of non-ventilated facades on floors 5-11 of the A-axis (Vokzal side) has reached 80%. The installation of non-ventilated facades on floors 5-11 of the A-axis (Vokzal side) has begun - we are aiming for 100% completion; installation of translucent structures on floors 17-24 of the A-axis (Novus side).

DECEMBER 2023

The floor of the fourth floor of the extension has been completed; all reinforced concrete works of the extension are now complete. Installation of translucent structures on the 12th-17th floors along the A-axis has begun.

November 2023

Overlapping of the third floor of the extension is completed; vertical elements of the fourth floor of the extension are installed; work has begun on translucent structures above the 11th floor.

OCTOBER 2023

We have completed the vertical elements and are finalizing the flooring of the third floor

SEPTEMBER 2023

We completed the monolithic works on the first floor of the extension and started working on the monolithic verticals of the second floor.

AUGUST 2023

We have installed window frames along the A-G axis up to the 11th floor and are finishing glazing the windows

JULY 2023

We installed window frames along the A-G axis up to the 11th floor and started glazing the windows.

JUNE 2023

We have completed the installation of window frames along the axes 1-15 and 15-1 up to the 11th floor and are installing window frames along the axes A-G up to the 11th floor

MAY 2023

We have completed the installation of window structures along the axis 15-1 to the 11th floor. We continue to install window structures along the 1-15 axis

APRIL 2023

Started installation of window systems along the E axis up to the eleventh floor

NOVEMBER 2022

The foundation of the extension has been completed, the vertical elements of the extension have been completed by 50%, the modernization of networks B1, K1, K2 is completed by 50%

OCTOBER 2022

Completed 100% of the monolith, arranged the grillage of the extension, began to modernize the networks B1, K1, K2

FEBRUARY 2022

Finished 60% of the roof monolith and 80% of the extension pile field.

JANUARY 2022

Finished monolith of 25th floor and 20% of 26th floor monolith, as well as 181 sq. m. concrete preparation of yard paving

SEPTEMBER 2021

Finished monolith up to 19th floor and brickwork up to 14th floor.

DECEMBER 2021

Finished 50% of 25th floor monolith and brickwork up to 22th floor

OCTOBER 2021

Finished monolith up to 22th floor and brickwork up to 16th floor

NOVEMBER 2021

Finished monolith up to 24th floor and brickwork up to 18th floor

AUGUST 2021

Finished monolith of 16th and 17th floor & brickwork up to 12th floor

JULY 2021

Finished monolith up to 15th floor & brickwork up to 10th floor

JUNE 2021

Finished monolith of 13th floor & brickwork up to 7th floor

MAY 2021

Finished monolith up to 11th floor and brickwork up to 5th floor

APRIL 2021

Finished monolith up to 8th floor & brickwork on 1st floor

DECEMBER 2020

We're finished monolith of 1st floor and started 2nd floor

FEBRUARY 2021

Finished monolith up to 3rd floor and started 4th floor

OCTOBER 2020

Started building of 1st floor

JUNE 2020

We have completed the building of the pile field. This is a huge preparatory stage of work, without any construction is impossible

Standard One
Terminal
Standard One Terminal
Location

Kyiv,
Січеславська, 1Б
Central Railway Station
terminal photo terminal photo terminal photo terminal photo
Kyiv,
Січеславська, 1Б
Central Railway Station

Documentation

Building permission
License of the general contractor
Project expertise
Town-planning conditions
Building permission
License of the general contractor
Project expertise
Town-planning conditions

Imprint

Customer:

LLC «STANDARTPROEKT»
03035, Kyiv city, Georgia Kirpy str, 5
EDRPOU (National State Registry of Ukrainian Enterprises and Organizations): 41309581
Foundation date: 28.04.2017
Director: Dmytro Avdyukhov

Bank details:

IBAN (USD) UA 97 322313 0000026007000051004
IBAN (USD) UA 24 325365 0000000260060007323


General contractor:

LLC “KDD STANDARD”
03035, Kyiv city, Georgia Kirpy str, 5B
EDRPOU (National State Registry of Ukrainian Enterprises and Organizations): 42042645
Foundation date: 03.04.2018
Director: Kucher Tetyana Mykolayivna

Bank details:

IBAN (USD) UA 96 380526 0000026001001071736
:
Visit our showroom.
We accurately recreate one of our future apartments.
You have the opportunity to rate the quality of renovation and furniture by our own.

“You can schedule for a preview and we will make a delicious coffee”

Incorrect name
illicit phone
incorrect mail
Please choose a different date

We’re waiting for you at